Just finished installing a new head, it is a Raritan Atlantis Freedom raw water flush, going in to a Purasan treatment system.
One of the problems I did not expect is that the back wall and the shower pan floor is not perpendicular. I had to make trim molding so I seal the back of the head to the back wall. I had a gap at the top is 3/4" it had to taper to 1/4" to the bottom.
I cut the back wall out so I can maintain or service the Head.
It was a little long process to do a HOW TO. If anyone has any questions please post or email.
The main thing is the Admiral approves.
Pic 1 - Head moulding and cutout
Pic 2 - Head installed
Pic 3 - Raw water pump head pump (left) filters and A/C circulator pump (right)
Pic 4 - Purasan and back of Head under v-burth
Pic 5 - Purasan top view
Pic 6 - Purasan Tablet mount
Robert
RiverRatt attached the following image(s):